A family charging an electric car with a home EV charger

EV Charger Installation in Sussex

A home charger is the simplest way to run an electric car. Plug in when you get home, charge overnight or from your own solar panels, and save public chargers for long trips.

Greener Solar Solutions installs home EV chargers across West Sussex, East Sussex, Surrey, Hampshire and Kent. We are MCS Certified, NICEIC Approved and TrustMark Registered. Every charger is fitted by our own directly employed electricians, never subcontractors, from our base at Hangar 4, Shoreham Airport.

Because we also install solar panels and battery storage, we can set your charger up to work with the rest of your home energy system rather than as a separate gadget on the wall.

What a home charger installation involves

Most of the work is in the wiring behind the wall box. A typical domestic installation includes:

  • A free survey. We look at where you park, where the electricity supply and meter are, and the best cable route between them. We also check your main fuse rating, the existing load on your supply, your consumer unit and your earthing arrangement.
  • A dedicated circuit. The charger gets its own circuit from the consumer unit (or a small separate board next to the meter), with cable sized for the length of the run.
  • The right protection. EV circuits need specific protection, including an RCD that can cope with DC leakage. These requirements are set out in Section 722 of BS 7671, the IET Wiring Regulations.
  • Earthing done properly. Most UK homes have a PME (combined neutral and earth) supply. BS 7671 requires outdoor charge points on these supplies to be protected against an “open-PEN” fault, a broken supply neutral that could otherwise make the car body live. Depending on the charger, this is done with built-in open-PEN detection or a separate earth electrode.
  • Testing, commissioning and handover. We test the circuit, set up the charger and its app, and show you how to schedule charging around your tariff.
  • Paperwork. You receive an electrical installation certificate. A new circuit is notifiable work under Part P of the Building Regulations, and NICEIC-registered contractors can self-certify it, so you don’t need to deal with building control yourself.

Choosing the right charger

7kW or 22kW?

Almost every house in Britain has a single-phase supply. On single phase, a home charger tops out at about 7.4kW (32 amps), which is why “7kW chargers” are the standard domestic choice. A 22kW charger needs a three-phase supply, which very few homes have. Many cars also limit how fast they can take AC charging, so a bigger wall box doesn’t always mean faster charging. We’ll check your supply and your car at survey and recommend what suits you.

Tethered or untethered?

A tethered charger has its cable permanently attached, so it’s quick to use but tied to one connector and cable length. An untethered charger is a socket you plug your own Type 2 cable into, which suits two different cars, shared parking or a future change of car.

Smart charging is now standard

Under the Electric Vehicles (Smart Charge Points) Regulations 2021, home chargers sold in Great Britain must be smart: able to schedule charging, preset to avoid peak times (which you can change), and with a short randomised start delay. So any compliant charger can work with an off-peak EV tariff. The real differences are the app, whether your energy supplier can control it directly, and whether it can charge from solar surplus.

Charging your car from your own solar panels

If you have solar panels, or are thinking about them, a solar-aware charger can put spare daytime generation into your car instead of exporting it to the grid.

A sensor on your incoming supply cable tells the charger when your home is exporting, and it adjusts the charging rate to match the surplus as clouds come and go. Solar-diverting chargers such as myenergi’s Zappi are built around this, and most can also top up from the grid when there isn’t enough sun.

One technical limit: cars won’t accept AC charging below 6 amps, about 1.4kW on single phase. So solar-only charging needs at least that much genuine surplus after your home has used what it needs, which favours larger arrays.

The catch is that many cars are away during the sunniest part of the day. A home battery can store the surplus and help charge the car in the evening. Our guide to solar and EV charging explains how the pieces fit together, and our Tesla Powerwall 3 page and solar battery cost guide cover the battery side.

If you don’t have panels yet, it’s worth designing the charger and solar system together, so the sensor, board layout and cable routes are done once.

Grants: who can and can’t claim

Chargepoint grant rules changed on 1 April 2026, so older advice online is often wrong.

  • Homeowners with a driveway or garage: there is no government grant towards a charger at a house you own with your own off-street parking.
  • Flat owners and renters: the Office for Zero Emission Vehicles (OZEV) grant gives 75% off the cost of buying and installing a chargepoint socket, up to £500, if you have private off-street parking. You need written permission from your landlord, freeholder or managing agent.
  • Homes with on-street parking only: a separate grant of up to £500 applies if you own or rent your home and are installing a permanent cross-pavement solution, such as a cable channel. You need consent from your local highway authority. Cable mats and covers don’t qualify.
  • Residential landlords and workplaces: separate OZEV schemes offer up to £500 per socket.

These grants are confirmed until 31 March 2027. Two rules catch people out. You must apply and be confirmed as eligible before the charger is fitted, because grants can’t be backdated. And the quote must come from an OZEV-authorised installer. If you think you might qualify, mention it when you first contact us so we can talk through the order of steps before anything is booked. Full details are on GOV.UK.

Planning permission and the October 2026 changes

In England, a wall-mounted charger in an area used for off-street parking is normally permitted development, so it doesn’t need a planning application. There are some limits: for example, the unit can’t sit more than 1.6 metres above the ground, and different rules apply at listed buildings and scheduled monuments.

From 21 October 2026, the rules were extended to help homes without a driveway. Cross-pavement cable channels installed by, or with the authorisation of, the highway authority no longer need planning permission, except in conservation areas, within the curtilage of listed buildings and on scheduled monument sites. Where a footway sits between the charger and the car, the cable must cross it through an authorised cross-pavement solution. You still need the highway authority’s consent for the channel itself. In Sussex that means West Sussex County Council, East Sussex County Council, or Brighton & Hove City Council, depending on where you live.

If your home is listed or in a conservation area, our listed buildings guide explains how consent works locally.

New-build homes and Part S

Since 15 June 2022, Approved Document S of the Building Regulations has required most new homes in England with associated parking to have a charge point with an output of at least 7kW. If you’re building or converting a home in Sussex, we can install the charge point alongside the solar PV and battery. Our new-build solar guide covers the energy side of a new home.

Telling your network operator

Every new home charger has to be reported to the local distribution network operator (DNO). In most of Sussex that’s UK Power Networks; SSEN covers the Chichester district and parts of western West Sussex. Under the Energy Networks Association process, a single charger can usually be installed and then notified within 28 days, as long as the supply is adequate and the home’s maximum demand stays within the limits. If the supply needs checking first, for example with more than one charger, a three-phase unit or a small main fuse, the DNO has to approve it before connection. We’ll tell you at survey which route applies.

Why choose Greener Solar Solutions?

To book a free survey, call 01273 455 695 (Monday to Friday, 08:00 to 17:00) or use our contact form.

EV charger installation: FAQs

Is there a grant for a home EV charger?

Not if you own a house with your own driveway or garage. Since 1 April 2026, OZEV grants of up to £500 (75% of the cost) are available to flat owners and renters with private off-street parking, households with on-street parking that install a cross-pavement solution, residential landlords and workplaces. You must be confirmed as eligible before installation, and the funding is confirmed until 31 March 2027.

Do I need planning permission for an EV charger?

Usually not for a wall-mounted charger in an area used for off-street parking in England, though listed buildings and some locations have limits. Since 21 October 2026, authorised cross-pavement channels also no longer need planning permission outside conservation areas, listed building curtilages and scheduled monument sites. You still need the highway authority’s consent for any channel across the pavement.

Should I choose a 7kW or a 22kW charger?

For nearly every home, a 7kW charger is the right choice. Most houses have a single-phase supply, which limits a home charger to about 7.4kW. A 22kW charger needs a three-phase supply, and many cars can’t use that speed for AC charging anyway. We check your supply and your car at survey.

Can my EV charger use electricity from my solar panels?

Yes, with a solar-aware charger. A sensor on your supply cable tells the charger when you’re exporting, and it adjusts the charging rate to match the surplus. Cars need at least about 1.4kW (6 amps on single phase) to charge, so solar-only charging works best with a reasonably sized array. A home battery can store surplus for evening charging.

Will my electricity supply cope with a charger?

Usually. At survey we check your main fuse rating, existing load, consumer unit and earthing. If your supply is tight, a charger with load management can reduce its charging rate when other appliances are running. Where an upgrade or approval is needed, we raise it with your network operator before work starts.

Do you notify the DNO and building control?

Every home charger has to be reported to the network operator. A single charger on an adequate supply can usually be notified within 28 days of installation, while larger or more complex installations need approval first. A new circuit is notifiable under Part P of the Building Regulations, which NICEIC-registered contractors can self-certify. You receive an electrical installation certificate when the job is complete.